Kristiansand access bridge

In order to enable the construction of a pipeline tunnel, but also to ensure the accessibility of several offices, a temporary bridge over the sheet pile wall pit was necessary. Our customer TT Anlegg chose the bridge system JSB-2 because this system could be installed quickly and because this bridge only needs to be put into use for 6 months.

The installation date was planned for April 26, 2022 and went without any problems in close cooperation with the customer.

Share on:

Projektdata

Lösning
Balkbro
Typ
JSB
Total längd
27 m
Sektionslängd
13,5 m
Bredd
5 m
Konstruktionshöjd inklusive lager
1,1 m
Friktionsbeläggning
Anti skid 2/3 mm
Egenvikt
69 tons
Design load
Loadcase 4-6, Bk 10/60 boggilast
Kund
TT Anlegg