Can you handle the entire process from design to dismantling of the bridge?
Short answer:
Yes. Janson Bridging takes care of the entire process for temporary and modular bridges in Belgium. From the initial intake and technical design to permits, transport, installation, inspection, maintenance, and smooth dismantling with full site restoration. You have one experienced partner who manages everything.
We support authorities, contractors, and companies with temporary bridge solutions, emergency bridges, traffic bridges, bicycle and pedestrian bridges, and pontoon bridges—fully compliant with applicable Belgian and European standards.
Request free advice or a quotation
Discover our temporary and modular bridge solutions
What do we take care of completely? (A–Z project relief)
Whether it concerns a temporary traffic bridge, an emergency bridge during infrastructure works, or a modular bridge for events: we take over control, planning, and risks. You get a single point of contact, clear milestones, and predictable lead times.
Our full-service offering includes:
Design & engineering (CE-compliant, according to NEN & Eurocodes)
Including site survey, stability and load calculations
Permits & traffic measures
H&S plan, BLVC approach, diversions, and coordination with authorities
Logistics & transport
Crane and lifting plans, road and waterway coordination
Installation & assembly
Fast modular assembly, testing, inspection, and handover
Monitoring & maintenance during use
Dismantling & site restoration
With minimal impact on the surroundings and infrastructure
Our approach: a clear 3-phase process
Phase 1 — Design & preparation
Intake and site visit (site survey)
Analysis of subsoil, water depth, flow conditions, and surroundings
Engineering & calculations
Concept and final design according to the required load capacity
Permits & stakeholders
Coordination with municipality, road authority, water authority, and emergency services
Planning & logistics
Lead time, construction method, lifting and transport plan
Phase 2 — Installation, testing & handover
Equipment & transport
Just-in-time delivery, crane and pontoon coordination
Assembly
Fast and safe installation with minimal disruption to traffic and surroundings
Inspection & testing
Load tests, safety checks, and handover documentation
Handover & instruction
Use, management, maintenance, and emergency routes
Phase 3 — Dismantling & restoration
Dismantling planning
Aligned with traffic flows, time windows, or events
Safe dismantling
Controlled lifting, removal, and material inspection
Site restoration
Clean and tidy handover, including any required ground repairs
Evaluation & documentation
For future deployment and optimisation
Which bridge types do we fully manage?
We supply and manage temporary and modular bridges in Belgium for a wide range of applications:
Pedestrian and bicycle bridges
For events, diversions, and maintenance works
Temporary traffic bridges
For light and heavy traffic, with custom load capacities
Pontoon bridges (floating bridges)
For water crossings, works, and emergencies
Emergency bridges
Rapid deployment in case of failure or renovation of existing infrastructure
View all our temporary bridge solutions
Planning and lead times
Lead times depend on location, permits, and bridge type. Indicative timelines:
-
Intake to concept design: 3–10 working days
-
Final design & permits: 2–8 weeks (in parallel where possible)
Installation/assembly:
-
± 1 day for a small pedestrian bridge
-
Several days for traffic or pontoon bridges
Dismantling & restoration: usually 1–2 days
We strongly focus on reliable planning and clear milestones.
Urgent project? We act fast and are available 24/7 if required.
Safety, standards, and permits
Safety is always paramount. We ensure demonstrable compliance and complete documentation.
Certification & standards
CE marking, NEN, Eurocodes, inspections and certifications
Safety & traffic plans
H&S plan, barriers, diversions, crowd control
Environment & sustainability
Limiting noise, vibrations, and emissions
Projects and references in Belgium and the Benelux
Curious how we deliver temporary bridges for municipalities, industry, contractors, and events?
View our recent projects and references.
View Janson Bridging projects
Active throughout Belgium and the Benelux
Janson Bridging operates throughout Belgium, the Netherlands, and Luxembourg.
With our own equipment and experienced partners, we are quickly on site in cities such as Antwerp, Brussels, Ghent, Leuven, Hasselt, and Bruges.
Frequently asked questions about temporary bridges
Do you really manage the entire process?
Yes. From intake and design to permits, installation, inspection, management, and dismantling. One point of contact, everything arranged.
What do you need for a quotation?
Location details, required flow (pedestrians/vehicles), indicative load capacity, deployment period, time windows, and photos or drawings.
Do you also arrange permits and traffic measures?
Yes. We support the full permitting process and provide H&S and traffic plans.
What is the lead time for a temporary bridge?
From a few weeks for simple bridges to several months for complex traffic or water crossings. Emergency solutions are possible.
What load capacities are possible?
From light pedestrian bridges to heavy traffic bridges (e.g. 60, 100, or 120 kN axle loads).
Can installation and dismantling take place outside office hours?
Yes. If required, at night or during weekends, with minimal disruption.
Advice or quotation? We take care of everything from design to dismantling
Choose certainty, safety, and speed for temporary and modular bridges in Belgium. Janson Bridging manages the entire process.
Contact us • View our solutions
Back to the homepage
What can we bridge for you?
Tell us what is challenging you and we’ll contact you ASAP to work out the best solution for your project.
Get in contact