JFB bridge as railway station platform access

As a part of revitalization of a railroad in Cieszyn, Poland, new station Cieszyn - University was planned by the Polish Railways (PLK PLK). To access its platform from Kazimierza Brodzińskiego street, a pedestrian bridge was needed due to environment protection requirements. JFB access bridge was selected by the general contractor and delivered within 3 months from order. It includes specific features corresponding PKP PLK requirements, such as leading path.

Share on:

Projektdata

Lösning
Fiber Reinforced Bridges
Typ
JFB
Längd
9m
Bredd
2m
Vikt
3000 kg
Trafiklast
Eurocode LM4
Material bärverk
Fibre-reinforced polymere
Friktionsbeläggning
Epoxy resin, anti-slip
Fiber Reinforced Bridges